Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Eurofins - George Rydell

CLIENT: Eurofins

LOCATION: Dandenong South

PROJECT

We were engaged by Eurofins to build their new testing laboratory on a 16,000 Sq m site in Dandenong South, Victoria. Built within an existing warehouse, the new services infrastructure consisted of 5,000 Sq m of laboratory and office space with the facility accommodating approximately 200 staff.

DETAILS

Some of the construction highlights included: a new 2000 Sq m post-tensioned mezzanine for future laboratory expansion, the installation of 12 AHU’s, chiller, compressed-air, vacuum system, RO water system, laboratory gas bulk storage and reticulation throughout the laboratory to equipment user points – gases included oxygen, argon, helium, nitrogen and hydrogen. There was also 23 fume cupboards and associated support services installed, along with HEPA filtered air to service microbiological laboratory.

Other installations included a power upgrade and backup generator, four cool rooms to support the laboratory operations, a new trade waste system and carpark extension to allow for off-street parking for staff.