Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Fonterra – Stanhope - George Rydell

CLIENT: Fonterra Australia

LOCATION: Stanhope

PROJECT

We were engaged for the design and construction of a 9t/hr cheese production facility with the main 5,800m2 cheese plant, whey processing plant and substantial upgrade to site fire and process services infrastructure. Fonterra engaged us without tender due to our previous record with their projects.

DETAILS

Due to the project’s tight timeframe we worked closely with Tetra Pak, the process contractor, to understand their install program and scheduled our works, staggering handovers in order to deliver the best possible time outcomes. We met or exceeded all handover milestones and were on target to take the first milk in late May 2017.