Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Kolbe Catholic College - George Rydell

CLIENT: Kolbe Catholic College

LOCATION: Greenvale Lakes

PROJECT

Construction of a new staff, administration and resource centre within the existing school.

DETAILS

Normal access for students and staff was successfully maintained throughout the construction period. The administration building was built on the main street frontage of the school and showcased various architectural features such as combination claddings of brickwork/CFC/Colorbond/Alucobond. Also included were a number of curved walls which were used throughout this project.