CLIENT: Kolbe Catholic College

LOCATION: Greenvale Lakes

PROJECT

Construction of a new staff, administration and resource centre within the existing school.

DETAILS

Normal access for students and staff was successfully maintained throughout the construction period. The administration building was built on the main street frontage of the school and showcased various architectural features such as combination claddings of brickwork/CFC/Colorbond/Alucobond. Also included were a number of curved walls which were used throughout this project.