Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Murray Goulburn – Laverton - George Rydell

CLIENT: Murray Goulburn

LOCATION: Laverton

PROJECT

George Rydell were engaged for the construction of a new $29m dairy facility for Coles/Devondale.

DETAILS

The plant consisted of a 2000m2 coolroom, 1800m2 process room, 4000m2 administration building, milk unloading, energy centre, tank farm, 4.5m deep trade waste pit and 12,000m2 of external concrete and landscaped surrounds. George Rydell worked closely with process and packaging contractors and within a very tight timeframe.